PROJECT Date begun In Progress Date Finished Notes Done! Remove bottom paint 8/15/02   10/7/02 Horrible job!   Remove ports & hatches 9/02   10/02 Use Anti-Bond to release bedding compound.   Remove deck hardware 9/02     3/1/03     Open up deck areas where possibly wet 7/03   7/3/03 Only one very small area needed repair! New core.   Remove/check LPG system 11/02   11/02 Need to replace hose.   Dismantle interior joinery 10/02   1/18/03     Finalize interior layout/electrical schematics 9/02   1/10/03     Remove electrical mess 12/02   12/02     Remove plumbing as needed 12/02   4/15/03 Ended up removing it ALL...   Remove delaminated sole 11/02   6/04     Remove refrigerator 12/02   12/02     Remove starboard water tank 1/2/03   1/2/03     Remove deck handrails 1/1/03   1/15/03 Bought brand new replacements   Remove companionway spray hoods, traveler 1/1/03   1/3/03     Repair exterior teak as needed 9/03   6/04     Sand/seal exterior varnish prior to deck paint 4/28/03   6/03     Clean bilge 1/8/03   1/11/03 Also replaced keel bolt washers/nuts, tightened.   Install HF ground & lightning ground 2/03     lighting ground strap from mast to keel to be installed when mast is stepped   Drop rudder; inspect 5/13/03   5/13/01 AARGH! Rudder stock corroded. Needs replacing!   Replace rudderstock; repair rudder 5/13/03         Mock up battery box and new water tank for sizes 1/2/03   1/3/03     Build new battery box, install new water tank 3/03   7/04 3 group 8Ds; 30 gallons water (130 gal. total)   Add inspection hatches to all tanks 12/27/02   8/04     Clean out 2 water tanks, fuel tank     8/04     Install new fresh water system plumbing 3/03   1/04 Whale Quick-Connect fittings and red/blue tubing.... expensive but nice stuff!   Install new raw water/ grey water plumbing 3/03   2/04 New top-quality marine hose everywhere, use Sealand Odorsafe for all sanitation hoses.   Replace Vernalift muffler with new     3/03 Special order...of course!   Clean water heater out and reinstall on new shelf 4/22/03   5/03 It was full of calcium deposits. Flushed with muriatic acid. New hoses.   Install holding tank     4/23/03 Ronco 18 gallon in engine room.   Install new DC electrical system 2/1/03   8/04 ABYC followed, all Boat Cable, Blue Seas, Ancor, etc.   Install new AC electrical system     4/20/04     Chainplates     5/03 Had ALL re-made!!   Replace LPG system, new stove 9/03   8/04 Force 10 3-burner...barely fit in! Their online specs are WRONG!   Check rigging thoroughly     11/03 Looks good! Will replace wire only.   Engine room: clean, re-insulate, add shelving 1/1/03   1/04 Engine room soundproofing is PRICEY!!! Relocated pumps, etc.   Replace sole at base of companionway and in walk-through 6/19/04   8/04     Repair sole hatches     6/04     Begin interior carpentry 1/20/03         Build nav station to trim stage 2/03   4/22/03     Build galley to trim stage 4/21/03   5/04     Install new faucets, showers, etc. 9/03   3/04     Build refrigerator box with shelving, thermostat, divider, new evaporator 10/03   1/04     Install new refer with VIP vacuum panel insulation 1/04   2/04     Build refer surround, lids, countertop     8/04 just needs lids built now!   Test/troubleshoot new refrigeration     2/04 Looks good so far! Still need to check w/thermometer.   build galley storage 4/18/04   5/04     Finish salon carpentry     9/04 just need to install doors and shelves...   Modify salon table     8/04     Finish V-berth & aft cabin new storage     5/04     Install new battery charger     4/12/03     Install new Racor filter, service existing, set up in parallel     12/03     Rewire  diesel engine     7/04 2 new 125 amp alternators   Re-install rebuilt rudder     7/04     New PSI Prop shaft seal, cutlass bearing     7/04 took out prop shaft entirely 6/18/04. Update 9/04: had to re-haul the boat and take OFF the PSS seal... did NOT FIT!   Install new bilge pumps in sump, reconfigure manual cockpit bilge pump 1/04   8/04     Service both Raritan PHII heads; reinstall; new plumbing     3/04 replace cracked bowl, remove electric unit, replace seals, general service   New self-tailing winches (main sheet, reef lines)     4/19/03 Found second-hand   Replace interior cabin sides 2/25/03   3/02/03 Plywood, epoxy, white formica   Replace rotted headliner supports 3/1/03   3/04/03     Clean and repair hatches and ports 8/03   9/03     Replace salon headliner     1/04     Sew curtains, sail cover, etc 6/04   8/04     Repair and/or replace stanchions/pushpit     7/04 Commissioned new pushpit with extended sides for solar panel mounting   Commission dodger/bimini     2/25/03 Dodger installed. Will wait until living aboard to finalize bimini design.   Sailmaker check sails     3/01/03     Buy new main, spinnaker, trisail     2/04 Commisioned spinnaker 2/04. Fully-battened main ordered 5/04. Try bought 5/04.   Build new cockpit coaming boxes, shower box     10/03     Mast step: clean, paint?     8/04     Build new mast step base (wood is cracked)     8/04     Install new nuts/washers on keel bolts & check 1/9/03   1/03     Service through-hulls     7/04     Remove hardware from spars     5/30/03 Not as bad as we thought!   Sand, refinish spars     8/04     Replace hardware, electronics to spars     9/04 Add lazy jacks, trisail track   Repair any soggy deck areas 7/1/03   7/03/03 Only one small area on stbd genoa track!   Reconfigure bow deck, install new windlass 8/03   12/03     Sand decks     7/4/03 Neil's 4th of July....   Repair gelcoat cracks, etc in decks 6/29/03   7/4/03     Prime/paint decks 7/4/03   8/03     Replace deck hardware, handrails 9/03   12/03 New Garhauer Traveller and Rigid Vang!   Build cockpit electronics box over c'way     10/03 New wind/speed/log, GPS   Make new interior cushions 2/04   6/1/04 Ultrasuede in Salon; Sunbrella elsewhere   Make and install new lifelines 6/15/04   8/04     Build & install inner forestay (& runners?) 11/03   10/04     Re-rig, tune rig     8/04 new wire   Remove name and hail 1/10/03   10/03     Sand/prep sheer/cove and boot stripes 4/26/04   7/04     Replace sheer/cove stripe and boot stripe     5/04 raised the waterline, new Flag Blue stripes   Replace name and hail 6/18/04   8/04     Compound hull 6/12/04   8/04     Sand bottom     4/04     Barrier coat bottom     5/04 Interlux "Interprotect" epoxy barrier coat   Paint bottom     5/04 Pettit Trinidad SR   Install windvane     6/20/04 gorgeous Fleming self-steering vane!   Order cockpit cushions       not sure we can justify the expense now that we're cruising! Finding it hard to stick to our budget!   Sand/strip interior varnish 12/03   6/04     Build doors for interior storage     8/04 Our friend Dave Fields, a fabulous cabinetmaker, is making them for us!   Interior finish carpentry 5/04   6/04     Interior finish work     8/04 Bungs, varnish   Exterior teak finish work     8/04 Bungs, varnish   Install solar panels     12/04     Build cockpit grates       Stan Murphy is making them for us!!.... (2005: I guess he is not. never heard back from him. too bad!!!!!....)   Build dorade box(es)       Have two beautiful stainless dorade vents! (2005: this is not currently high on our priority list since our opening ports and hatches are doing a great job. When we're back in Maine?)